- Suburb
- Hornsby
- Time on site
- 4 weeks
- Team
- 3 on site
- Indicative cost
- $35,000 – $50,000 [TO CONFIRM]
Photos

The slope before work, with rubble and failed sleeper edging.

Finished sandstone terracing with stone steps running up the centre.

The slope before work, with rubble and failed sleeper edging.

Finished sandstone terracing with stone steps running up the centre.