
Retail · IKEA
IKEA Rhodes HVAC Upgrade
Zero
gas onsite
Replacement of existing 2,200 kW air-cooled DX plant with high-efficiency air-cooled heat-recovery chillers, allowing decommissioning of the gas boiler.
$2,400,000 · Rhodes, NSW
Innovation to Fabrication
i2F bridges high-level HVAC consultancy and shop-floor fabrication. We design mechanical services that perform and pre-fabricate the pipework that fits — engineered to the millimetre.
Fig. 01 — Modular spool assembly · LOD 400
CHW · DN350
[01]
$0M
FY24 projects revenue
[02]
0+
industry experience
[03]
0+
in-house technicians
[04]
0
market sectors served
[ Capabilities ]
From feasibility through fabrication and commissioning, we own the engineering chain so the design intent survives every handover.
Full turn-key bespoke HVAC design and construct.
NEBB-certified commissioning, NABERS audits, energy management.
Off-site precision welding and modular spool assembly.
Revit 3D modelling to LOD 400, site-survey scanning, clash detection.
[ The Pipeline ]
A continuous engineering pipeline: each handover is internal, so design intent reaches site without translation loss.
Site surveys, energy audits and mechanical feasibility against AS/NZS standards.
Hydraulic modelling, equipment selection and full mechanical specification.
Collision-free 3D coordination and pre-fabrication shop drawing generation.
Precision welding and modular spool assembly under workshop QA.
Rapid modular install and NEBB-balanced commissioning to handover.
[ Selected works ]

Retail · IKEA
Zero
gas onsite
Replacement of existing 2,200 kW air-cooled DX plant with high-efficiency air-cooled heat-recovery chillers, allowing decommissioning of the gas boiler.
$2,400,000 · Rhodes, NSW

Retail · QIC
7,000 kW
new cooling installed
Stage 1 plant-room consolidation across multiple historic plant zones, with new water-cooled chillers, cooling towers and BMS interlink pipework.
$4,200,000 · Ringwood, VIC
Trusted by Tier-1 owners, contractors and asset managers

[ Heritage ]
Mechanical works inside the buildings most teams won't touch: live, occupied, heritage-listed, and intolerant of error.
[ Engineers ]
45 yrs
ND
Neil Dickson
Director of Operations
35 yrs
RT
Ross Tomblin
Energy Solutions Manager
17 yrs
ND
Naveen Dhakshinamoorthy
Associate Director, Technical Services
15 yrs
KS
Kamran Syed
Manager, NSW Projects
[ Engage ]
Two ways to start. Pick whichever fits where you are in the project.
