[01] · Retail · IKEA
IKEA Rhodes HVAC Upgrade
Replacement of existing 2,200 kW air-cooled DX plant with high-efficiency air-cooled heat-recovery chillers, allowing decommissioning of the gas boiler.
Zero
gas onsite
$2,400,000
Rhodes, NSW
[ Projects ]
Named projects, real values, measurable outcomes. Each case study below is sourced from delivery records, not marketing copy.

[01] · Retail · IKEA
Replacement of existing 2,200 kW air-cooled DX plant with high-efficiency air-cooled heat-recovery chillers, allowing decommissioning of the gas boiler.
Zero
gas onsite
$2,400,000
Rhodes, NSW

[02] · Retail · QIC
Stage 1 plant-room consolidation across multiple historic plant zones, with new water-cooled chillers, cooling towers and BMS interlink pipework.
7,000 kW
new cooling installed
$4,200,000
Ringwood, VIC

[03] · Retail · Mirvac
HVAC upgrade and design-and-construct delivery across the Birkenhead Point shopping centre, including Geoclima air-cooled chiller and BAC cooling tower installation.
Live trading
throughout
$2,100,000
Drummoyne, NSW

[04] · Recreation · Frankston City Council
Full mechanical plant replacement for an operational aquatic centre, including Rheem heat-pump pool heating and Tridium BMS.
100%
heat-pump pool heating
$3,200,000
Frankston, VIC

[05] · Healthcare · NSW Health
Major mechanical refurbishment of one of Australia's largest healthcare campuses, led by senior mechanical engineering team members.
$80M
mechanical package
$80,000,000
Westmead, NSW